Pre-construction Schedule of Condition for a Shopping Mall - Southampton

A major refurbishment and expansion of a mezzanine level food hall was proposed. Located in the middle of the shopping centre the contractor was concerned to have a record particularly as the work on the project would be carried out during the night time. Metcalfe Briggs Surveyors undertook a detailed survey to produce a written Schedule with associated photographs of the condition of all retail unit and common area façades, the tiled floors, soffits, stairs and balconies. The Schedule of Condition provided a comprehensive record of all finished surfaces for both the contractor and the stakeholders of the mall.