Schedule of Condition for London Development - Westminster

A major commercial development was to commence on 3 sides of this 5 storey listed property in Central London.  This entailed demolition of the existing surrounding buildings and new construction, including at lower ground level.  The contractor’s client wanted a Schedule of Condition at the start of the works.

The subject property was vacated for the duration of the works.  Metcalfe Briggs Surveyors completed an internal and external Schedule of Condition.  Internally a number of rooms had detailed plaster mouldings and timber paneling which required a very methodical approach to complete our work.

We delivered a comprehensive Schedule, an archive record against which any future defects could be measured.